31MW GE Gas Turbine Power Plant w/HRSG boiler, 50Hz,
well maintained and a complete package, new 2007
31 MW LM2500 Gas Turbine Power Plant
Complete plant with (1) 31 MW + LM2500 Gas Turbine, HRSG boiler with supplementary burner
Generator 10.5 KV, SOHZ, Year: 2007, Fuel Natural Gas (NG) Hours run since overhaul 12,000 hrs.
Borescope performed in 2018.
Includes , Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more.
Plant has been well maintained and is a complete package.
Boiler: 56 bar HRSG boiler with supplementary burner
Scope of Supply:
31 MW LM2500 Gas Turbine Power Plant
Turbine and accessories:
Turbine Scada system, Master PC Turbine Scada Client PC Turbine control system Turbine control room
Turbine fire detection system
Reviews
There are no reviews yet.